1. Free-standing jacuzzi
2. The free-standing jacuzzi is relatively simple to install, and the matters needing attention are also less, mainly paying attention to electricity and waterproof.
1. Design reserved space, try to reserve a little more space.
2. Place the jacuzzi in the reserved position and place the drain to ensure the smooth flow of the water. Keep adjusting the anchor screws so that all the anchor screws securely level the cylinder.
3. Pay attention to reserve power distribution pipes or sockets during construction.
4. Please refer to the volts given by the Jacuzzi manufacturer for the power supply line.
5. After the cylinder of the bathtub is installed, adjust the position of the jacuzzi to the best position. Then turn on the water and check if the various functions are working properly and make the appropriate adjustments.

Second, the inlaid jacuzzi
The in-line jacuzzi is relatively more demanding and there are more places to pay attention to.
1. To know the exact size of the jacuzzi in advance, make room reservations, because the space reserved for the in-line type must be accurate, and it is too big to be placed.
2. The floor should be waterproofed before installation.
3. Make surface protection work when installing the jacuzzi to avoid scratching the jacuzzi during installation.
4. After the cement mortar is used for drying, the brick wall and the floor and wall bricks can be attached. When installing brick walls, the inspection holes should be reserved in the direction of the motor and the drain. The motor inspection hole should be about 40cm square and be facing the motor position.
5. If using a bathtub top faucet, fix the faucet body and the water quantity control valve to the bathtub before installing the bathtub. Connect the water supply pipe after the bathtub is installed. Please be careful to install it, do not let it leak. A manhole should also be reserved on the brick wall near the faucet. The inspection size is about 30cm square.
Finally, warm reminder:
1. When installing various bathtubs, cover the surface with cardboard or wood to avoid damage during construction.
2. Do not mix cement in the bathtub.
3. Do not place the cigarette butt in the bathtub to avoid burning the bathtub surface.
4. After installing the bathtub, please remove the cement.
5. Do not put sharp or rough utensils in the bathtub during construction, otherwise it will cause the surface of the bathtub to wear.
6. To remove surface dirt, use a sponge or soft fabric with a neutral detergent. Do not use acid or sputum, or a rough (such as a melon cloth) cleaning device.